India Lab Expo - Hyderabad - 2019
Please visit us at Stall No. B-16, Hall No. 1
Dates : 19th, 20th, 21st September - 2019
Venue : Hitex road, Hyderabad
Inner Chamber made of mirror Polished Stainless Steel (S.S. 304) material & Outer body is fabricated from PRE-FABRICATED PUFF Panels
Inner Chamber made of mirror Polished Stainless Steel (S.S.304) material & Outer body is fabricated from MATT FINISHED S.S. – 304 Material
EIE Stability Chambers are designed as per ICH Guidelines for precise monitoring of temperature and humidity conditions required for long term, intermediate & accelerated stability studies at chemical, pharmaceutical, agrochemical manufacturing facilities. These chambers are manufactured to comply with GMP requirements.
Non-condensing type Steam injection system & reservoir tank with water level arrangement with indicator.
Hermetically sealed compressor, which is CFC free and eco-friendly, utilizes the refrigerant (R-134A gas) to maintain chamber temperature within specified range.
Working chamber sizes (Meter) (W X D X H) | Volume (Liters) | No of trays | Product codes |
2.0 x 1.0 x 2.0 | 4000 | 8 | EIE-106WG40 |
2.0 x 1.5 x 2.0 | 6000 | 12 | EIE-106WG60 |
2.0 x 2.0 x 2.0 | 8000 | 24 | EIE-106WG80 |
2.0 x 2.5 x 2.5 | 12500 | 28 | EIE-106WG125 |
2.5 x 3.0 x 2.5 | 18750 | 36 | EIE-106WG187 |
3.1 x 3.0 x 2.5 | 23250 | 40 | EIE-106WG232 |
3.7 x 3.5 x 2.5 | 32500 | 66 | EIE-106WG325 |
3.9 x 3.9 x 3.0 | 45000 | 84 | EIE-106WG450 |
3.85 x 5.2 x 2.5 | 50000 | 100 | EIE-106WG500 |
6.4 x 5.0 x 2.5 | 80000 | 200 | EIE-106WG800 |
W : Walk-In | G : GMP | P : Powder coating
Note: Other sizes are available on request.
NABL Accredited Calibration Laboratory
Calibration & Validation ServicesPlease visit us at Stall No. B-16, Hall No. 1
Dates : 19th, 20th, 21st September - 2019
Venue : Hitex road, Hyderabad
Kindly Visit us at Stall No: B-9 Date: April 19,20,21, 2019 at Parade Ground, Opp ISBT, Sector 17, Chandigarh.
To get more information on our products and services, Email us now.